Sequencing work around a calendar that will not move
The calendar is a fixed constraint, and treating it as negotiable is the most common planning error.
Project timelines are usually built forward from a start date and a set of dependencies, then checked against the institutional calendar at the end to see what conflicts. The order should be reversed. Start with the calendar, which cannot change, and identify the windows where each group of staff can plausibly absorb disruption. Then fit the work into those windows, accepting that this will produce a longer overall timeline with gaps in it. The gaps are not waste. They are the difference between a change that holds and one that is abandoned under pressure.
Sequencing by group rather than by function often works better than the reverse in an institution with a staggered calendar. If different areas have their pressure peaks at different points, the work can move around the institution following the troughs, with each group getting the attention and support it needs when it is actually able to use it. This is harder to coordinate and easier to sustain, which is generally the right trade in an environment where abandonment is the main risk.
The other discipline worth naming is deliberate slack. A plan with no room in it will meet a genuine emergency, because an education provider always eventually meets one, and every subsequent step will be compressed to recover. Compression falls hardest on the parts that were already weakest, which are usually training and support rather than the technical work. Building in room that is expected to be consumed is not padding. It is a recognition that the calendar will assert itself whether or not the plan allows for it.